Re: [EnergyPlus_Support] HEADERED PUMPS:SIMPLE:CONSTANT SPEED





If I remember correctly you can use the headered pumps only in plant loop and not in condenser loops. Try removing the headered pumps in condenser loop. If it still gives error in plant loop there could be something else going on.

Thanks
Sankar

yangchen19851226 wrote:

In my err file,tips are as follows.HEADERED PUMPS:SIMPLE:CONSTANT SPEED were used both in condenser and cooling side.I can only get sizing datas of zone component and plant.In the idf file,Do the weather file simulation option was set to yes.But in the simulation the weather simulation was not done.Is it because there is a fatal error in the error file.

Another thing made me puzzled is that the results show some warning and no severe error.

** Fatal ** SimCondEquip: Invalid Equipment type requested=HEADERED PUMPS:SIMPLE:CONSTANT SPEED
...Summary of Errors that led to program termination:



-- 
Sankar Padhmanabhan
Graduate Research Assistant
Ph.D Student
Mechanical & Aerospace Engg
Oklahoma State University,
Stillwater, OK-74078
Ph:405-744-2410 (O)


__._,_.___


The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are not allowed -- please post any files to the appropriate folder in the Files area of the Support Web Site.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___