�If anyone knows what I am doing wrong in any of this errors can please drop me a line to say how I can solve them
many thanks
Program Version,EnergyPlus 6.0.0.023, 29/11/2010 12:13,IDD_Version 6.0.0.023
** Warning ** No Timestep object found. Number of TimeSteps in Hour defaulted to 4.
** Warning ** No reporting elements have been requested. No simulation results produced.
** ~~~ ** ...Review requirements such as "Output:Table:SummaryReports", "Output:Table:Monthly", "Output:Variable", "Output:Meter" and others.
** Warning ** ManageSizing: For a zone sizing run, there must be at least 1 Sizing:Zone input object. SimulationControl Zone Sizing option ignored.
** Warning ** World Coordinate System selected. Any non-zero Building/Zone North Axes or non-zero Zone Origins are ignored.
** ~~~ ** These may be used in daylighting reference point coordinate calculations but not in normal geometry inputs.
** Warning ** Distance between two vertices < .01, possibly coincident. for Surface=ADF1C2, in Zone=TOILET_CORRIDOR
** ~~~ ** Vertex [3]=(38.50,19.56,0.00)
** ~~~ ** Vertex [1]=(38.50,19.56,0.00)
** Warning ** ProcessScheduleInput: Schedule:Compact="PEOPLE_OFFICE_WEEKDAY_SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Severe ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_OFFICE_SCHEDULE_dy_1
** ~~~ ** ref Schedule:Compact="LIGHTS_OFFICE_SCHEDULE"
** Warning ** ProcessScheduleInput: Schedule:Compact="LIGHTS_OFFICE_SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Severe ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=ELEC_EQUIP_OFFICE_SCHEDULE_dy_1
** ~~~ ** ref Schedule:Compact="ELEC_EQUIP_OFFICE_SCHEDULE"
** Warning ** ProcessScheduleInput: Schedule:Compact="ELEC_EQUIP_OFFICE_SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Warning ** ProcessScheduleInput: Schedule:Compact="ACTIVITY_OFFICE_SCH", Schedule Type Limits Name="ANYNUMBER" not found -- will not be validated
** Warning ** ProcessScheduleInput: Schedule:Compact="HEATING-SETPOINT-SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Warning ** ProcessScheduleInput: Schedule:Compact="VENTILATION_ HOURS_OF_OPERATION" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAYS
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Severe ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_STORAGE_SCHEDULE_dy_1
** ~~~ ** ref Schedule:Compact="LIGHTS_STORAGE_SCHEDULE"
** Severe ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_STORAGE_SCHEDULE_dy_2
** ~~~ ** ref Schedule:Compact="LIGHTS_STORAGE_SCHEDULE"
** Warning ** ProcessScheduleInput: Schedule:Compact="LIGHTS_STORAGE_SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Severe ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_MEETING_ROOM_SCHEDULE_dy_1
** ~~~ ** ref Schedule:Compact="LIGHTS_MEETING_ROOM_SCHEDULE"
** Severe ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_MEETING_ROOM_SCHEDULE_dy_2
** ~~~ ** ref Schedule:Compact="LIGHTS_MEETING_ROOM_SCHEDULE"
** Warning ** ProcessScheduleInput: Schedule:Compact="LIGHTS_MEETING_ROOM_SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Warning ** ProcessScheduleInput: Schedule:Compact="ELEC_EQUIP_NON-OFFICE_AREAS_SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Warning ** ProcessScheduleInput: Schedule:Compact="ELEC_EQUIP_MEETING_SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Warning ** ProcessScheduleInput: Schedule:Compact="HEATING-SETPOINT_NON_OFFICES-SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Warning ** ProcessScheduleInput: Schedule:Compact="COOLING-SETPOINT_NON_OFFICES-SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Warning ** ProcessScheduleInput: Schedule:Compact="COOLING-SETPOINT-SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Fatal ** ProcessScheduleInput: Preceding Errors cause termination.
...Summary of Errors that led to program termination:
..... Reference severe error count=6
..... Last severe error=ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_MEETING_ROOM_SCHEDULE_dy_2
************* Fatal error -- final processing. More error messages may appear.
************* Testing Individual Branch Integrity
************* All Branches passed integrity testing
************* Testing Individual Supply Air Path Integrity
************* All Supply Air Paths passed integrity testing
************* Testing Individual Return Air Path Integrity
************* All Return Air Paths passed integrity testing
************* No node connection errors were found.
************* EnergyPlus Warmup Error Summary. During Warmup: 0 Warning; 0 Severe Errors.
************* EnergyPlus Sizing Error Summary. During Sizing: 1 Warning; 0 Severe Errors.
************* EnergyPlus Terminated--Fatal Error Detected. 18 Warning; 6 Severe Errors; Elapsed Time=00hr 00min 3.14sec
__._,_.___