[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [EnergyPlus_Support] i get this type of error anyone has any idea what I am doing wrong?





Could you paste the�PEOPLE_OFFICE_WEEKDAY_SCHEDULE or the whole idf?
I guess you might need to add "AllOtherDays" to the last "For:" in your Schedule:Compact like this

For: Sunday Holidays AllOtherDays, � ! In my case I've got the same behaviour on Sunday, Holidays and AllOtherDays

in order to fix the severe error but I'm not sure without the idf. You've also got lots of warnings you might consider fixing.

Martin

On Mon, Nov 29, 2010 at 2:30 PM, motabmx1 <motabmx1@xxxxxxxxx> wrote:

If anyone knows what I am doing wrong in any of this errors can please drop me a line to say how I can solve them

many thanks

Program Version,EnergyPlus 6.0.0.023, 29/11/2010 12:13,IDD_Version 6.0.0.023
** Warning ** No Timestep object found. Number of TimeSteps in Hour defaulted to 4.
** Warning ** No reporting elements have been requested. No simulation results produced.
** ~~~ ** ...Review requirements such as "Output:Table:SummaryReports", "Output:Table:Monthly", "Output:Variable", "Output:Meter" and others.
** Warning ** ManageSizing: For a zone sizing run, there must be at least 1 Sizing:Zone input object. SimulationControl Zone Sizing option ignored.
** Warning ** World Coordinate System selected. Any non-zero Building/Zone North Axes or non-zero Zone Origins are ignored.
** ~~~ ** These may be used in daylighting reference point coordinate calculations but not in normal geometry inputs.
** Warning ** Distance between two vertices < .01, possibly coincident. for Surface=ADF1C2, in Zone=TOILET_CORRIDOR
** ~~~ ** Vertex [3]=(38.50,19.56,0.00)
** ~~~ ** Vertex [1]=(38.50,19.56,0.00)
** Warning ** ProcessScheduleInput: Schedule:Compact="PEOPLE_OFFICE_WEEKDAY_SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Severe ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_OFFICE_SCHEDULE_dy_1
** ~~~ ** ref Schedule:Compact="LIGHTS_OFFICE_SCHEDULE"
** Warning ** ProcessScheduleInput: Schedule:Compact="LIGHTS_OFFICE_SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Severe ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=ELEC_EQUIP_OFFICE_SCHEDULE_dy_1
** ~~~ ** ref Schedule:Compact="ELEC_EQUIP_OFFICE_SCHEDULE"
** Warning ** ProcessScheduleInput: Schedule:Compact="ELEC_EQUIP_OFFICE_SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Warning ** ProcessScheduleInput: Schedule:Compact="ACTIVITY_OFFICE_SCH", Schedule Type Limits Name="ANYNUMBER" not found -- will not be validated
** Warning ** ProcessScheduleInput: Schedule:Compact="HEATING-SETPOINT-SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Warning ** ProcessScheduleInput: Schedule:Compact="VENTILATION_ HOURS_OF_OPERATION" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAYS
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Severe ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_STORAGE_SCHEDULE_dy_1
** ~~~ ** ref Schedule:Compact="LIGHTS_STORAGE_SCHEDULE"
** Severe ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_STORAGE_SCHEDULE_dy_2
** ~~~ ** ref Schedule:Compact="LIGHTS_STORAGE_SCHEDULE"
** Warning ** ProcessScheduleInput: Schedule:Compact="LIGHTS_STORAGE_SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Severe ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_MEETING_ROOM_SCHEDULE_dy_1
** ~~~ ** ref Schedule:Compact="LIGHTS_MEETING_ROOM_SCHEDULE"
** Severe ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_MEETING_ROOM_SCHEDULE_dy_2
** ~~~ ** ref Schedule:Compact="LIGHTS_MEETING_ROOM_SCHEDULE"
** Warning ** ProcessScheduleInput: Schedule:Compact="LIGHTS_MEETING_ROOM_SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Warning ** ProcessScheduleInput: Schedule:Compact="ELEC_EQUIP_NON-OFFICE_AREAS_SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Warning ** ProcessScheduleInput: Schedule:Compact="ELEC_EQUIP_MEETING_SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Warning ** ProcessScheduleInput: Schedule:Compact="HEATING-SETPOINT_NON_OFFICES-SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Warning ** ProcessScheduleInput: Schedule:Compact="COOLING-SETPOINT_NON_OFFICES-SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Warning ** ProcessScheduleInput: Schedule:Compact="COOLING-SETPOINT-SCHEDULE" has missing day types in Through=12/31
** ~~~ ** Last "For" field=FOR: SUNDAY
** ~~~ ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
** ~~~ ** Missing day types will have 0.0 as Schedule Values
** Fatal ** ProcessScheduleInput: Preceding Errors cause termination.
...Summary of Errors that led to program termination:
..... Reference severe error count=6
..... Last severe error=ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_MEETING_ROOM_SCHEDULE_dy_2
************* Fatal error -- final processing. More error messages may appear.
************* Testing Individual Branch Integrity
************* All Branches passed integrity testing
************* Testing Individual Supply Air Path Integrity
************* All Supply Air Paths passed integrity testing
************* Testing Individual Return Air Path Integrity
************* All Return Air Paths passed integrity testing
************* No node connection errors were found.
************* EnergyPlus Warmup Error Summary. During Warmup: 0 Warning; 0 Severe Errors.
************* EnergyPlus Sizing Error Summary. During Sizing: 1 Warning; 0 Severe Errors.
************* EnergyPlus Terminated--Fatal Error Detected. 18 Warning; 6 Severe Errors; Elapsed Time=00hr 00min 3.14sec




__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___