[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[EnergyPlus_Support] i get this type of error anyone has any idea what I am doing wrong?



If anyone knows what I am doing wrong in any of this errors can please drop me a line to say how I can solve them

many thanks


Program Version,EnergyPlus 6.0.0.023, 29/11/2010 12:13,IDD_Version 6.0.0.023
   ** Warning ** No Timestep object found.  Number of TimeSteps in Hour defaulted to 4.
   ** Warning ** No reporting elements have been requested. No simulation results produced.
   **   ~~~   ** ...Review requirements such as "Output:Table:SummaryReports", "Output:Table:Monthly", "Output:Variable", "Output:Meter" and others.
   ** Warning ** ManageSizing: For a zone sizing run, there must be at least 1 Sizing:Zone input object. SimulationControl Zone Sizing option ignored.
   ** Warning ** World Coordinate System selected.  Any non-zero Building/Zone North Axes or non-zero Zone Origins are ignored.
   **   ~~~   ** These may be used in daylighting reference point coordinate calculations  but not in normal geometry inputs.
   ** Warning ** Distance between two vertices < .01, possibly coincident. for Surface=ADF1C2, in Zone=TOILET_CORRIDOR
   **   ~~~   ** Vertex [3]=(38.50,19.56,0.00)
   **   ~~~   ** Vertex [1]=(38.50,19.56,0.00)
   ** Warning ** ProcessScheduleInput: Schedule:Compact="PEOPLE_OFFICE_WEEKDAY_SCHEDULE" has missing day types in Through=12/31
   **   ~~~   ** Last "For" field=FOR: SUNDAY
   **   ~~~   ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
   **   ~~~   ** Missing day types will have 0.0 as Schedule Values
   ** Severe  ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_OFFICE_SCHEDULE_dy_1
   **   ~~~   ** ref Schedule:Compact="LIGHTS_OFFICE_SCHEDULE"
   ** Warning ** ProcessScheduleInput: Schedule:Compact="LIGHTS_OFFICE_SCHEDULE" has missing day types in Through=12/31
   **   ~~~   ** Last "For" field=FOR: SUNDAY
   **   ~~~   ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
   **   ~~~   ** Missing day types will have 0.0 as Schedule Values
   ** Severe  ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=ELEC_EQUIP_OFFICE_SCHEDULE_dy_1
   **   ~~~   ** ref Schedule:Compact="ELEC_EQUIP_OFFICE_SCHEDULE"
   ** Warning ** ProcessScheduleInput: Schedule:Compact="ELEC_EQUIP_OFFICE_SCHEDULE" has missing day types in Through=12/31
   **   ~~~   ** Last "For" field=FOR: SUNDAY
   **   ~~~   ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
   **   ~~~   ** Missing day types will have 0.0 as Schedule Values
   ** Warning ** ProcessScheduleInput: Schedule:Compact="ACTIVITY_OFFICE_SCH", Schedule Type Limits Name="ANYNUMBER" not found -- will not be validated
   ** Warning ** ProcessScheduleInput: Schedule:Compact="HEATING-SETPOINT-SCHEDULE" has missing day types in Through=12/31
   **   ~~~   ** Last "For" field=FOR: SUNDAY
   **   ~~~   ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
   **   ~~~   ** Missing day types will have 0.0 as Schedule Values
   ** Warning ** ProcessScheduleInput: Schedule:Compact="VENTILATION_ HOURS_OF_OPERATION" has missing day types in Through=12/31
   **   ~~~   ** Last "For" field=FOR: SUNDAYS
   **   ~~~   ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
   **   ~~~   ** Missing day types will have 0.0 as Schedule Values
   ** Severe  ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_STORAGE_SCHEDULE_dy_1
   **   ~~~   ** ref Schedule:Compact="LIGHTS_STORAGE_SCHEDULE"
   ** Severe  ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_STORAGE_SCHEDULE_dy_2
   **   ~~~   ** ref Schedule:Compact="LIGHTS_STORAGE_SCHEDULE"
   ** Warning ** ProcessScheduleInput: Schedule:Compact="LIGHTS_STORAGE_SCHEDULE" has missing day types in Through=12/31
   **   ~~~   ** Last "For" field=FOR: SUNDAY
   **   ~~~   ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
   **   ~~~   ** Missing day types will have 0.0 as Schedule Values
   ** Severe  ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_MEETING_ROOM_SCHEDULE_dy_1
   **   ~~~   ** ref Schedule:Compact="LIGHTS_MEETING_ROOM_SCHEDULE"
   ** Severe  ** ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_MEETING_ROOM_SCHEDULE_dy_2
   **   ~~~   ** ref Schedule:Compact="LIGHTS_MEETING_ROOM_SCHEDULE"
   ** Warning ** ProcessScheduleInput: Schedule:Compact="LIGHTS_MEETING_ROOM_SCHEDULE" has missing day types in Through=12/31
   **   ~~~   ** Last "For" field=FOR: SUNDAY
   **   ~~~   ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
   **   ~~~   ** Missing day types will have 0.0 as Schedule Values
   ** Warning ** ProcessScheduleInput: Schedule:Compact="ELEC_EQUIP_NON-OFFICE_AREAS_SCHEDULE" has missing day types in Through=12/31
   **   ~~~   ** Last "For" field=FOR: SUNDAY
   **   ~~~   ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
   **   ~~~   ** Missing day types will have 0.0 as Schedule Values
   ** Warning ** ProcessScheduleInput: Schedule:Compact="ELEC_EQUIP_MEETING_SCHEDULE" has missing day types in Through=12/31
   **   ~~~   ** Last "For" field=FOR: SUNDAY
   **   ~~~   ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
   **   ~~~   ** Missing day types will have 0.0 as Schedule Values
   ** Warning ** ProcessScheduleInput: Schedule:Compact="HEATING-SETPOINT_NON_OFFICES-SCHEDULE" has missing day types in Through=12/31
   **   ~~~   ** Last "For" field=FOR: SUNDAY
   **   ~~~   ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
   **   ~~~   ** Missing day types will have 0.0 as Schedule Values
   ** Warning ** ProcessScheduleInput: Schedule:Compact="COOLING-SETPOINT_NON_OFFICES-SCHEDULE" has missing day types in Through=12/31
   **   ~~~   ** Last "For" field=FOR: SUNDAY
   **   ~~~   ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
   **   ~~~   ** Missing day types will have 0.0 as Schedule Values
   ** Warning ** ProcessScheduleInput: Schedule:Compact="COOLING-SETPOINT-SCHEDULE" has missing day types in Through=12/31
   **   ~~~   ** Last "For" field=FOR: SUNDAY
   **   ~~~   ** Missing day types="Holiday","SummerDesignDay","WinterDesignDay","CustomDay1","CustomDay2"
   **   ~~~   ** Missing day types will have 0.0 as Schedule Values
   **  Fatal  ** ProcessScheduleInput: Preceding Errors cause termination.
   ...Summary of Errors that led to program termination:
   ..... Reference severe error count=6
   ..... Last severe error=ProcessScheduleInput: ProcessIntervalFields, Processing time fields, incomplete day detected, Schedule:Compact DaySchedule Fields=LIGHTS_MEETING_ROOM_SCHEDULE_dy_2
   ************* Fatal error -- final processing.  More error messages may appear.
   ************* Testing Individual Branch Integrity
   ************* All Branches passed integrity testing
   ************* Testing Individual Supply Air Path Integrity
   ************* All Supply Air Paths passed integrity testing
   ************* Testing Individual Return Air Path Integrity
   ************* All Return Air Paths passed integrity testing
   ************* No node connection errors were found.
   ************* EnergyPlus Warmup Error Summary. During Warmup: 0 Warning; 0 Severe Errors.
   ************* EnergyPlus Sizing Error Summary. During Sizing: 1 Warning; 0 Severe Errors.
   ************* EnergyPlus Terminated--Fatal Error Detected. 18 Warning; 6 Severe Errors; Elapsed Time=00hr 00min  3.14sec




------------------------------------

Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/EnergyPlus_Support/

<*> Your email settings:
    Individual Email | Traditional

<*> To change settings online go to:
    http://groups.yahoo.com/group/EnergyPlus_Support/join
    (Yahoo! ID required)

<*> To change settings via email:
    EnergyPlus_Support-digest@xxxxxxxxxxxxxxx 
    EnergyPlus_Support-fullfeatured@xxxxxxxxxxxxxxx

<*> To unsubscribe from this group, send an email to:
    EnergyPlus_Support-unsubscribe@xxxxxxxxxxxxxxx

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/