[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[EnergyPlus_Support] How to run DesignDay simulations - Summer and Winter



Hello Group,
I'm not sure how to run both a Summer and a Winter DesignDay simulation.

If the idf specifies x2 SizingPeriods, i.e. 
SizingPeriod:DesignDay, Winter,  !- Design Day Name 

AND

SizingPeriod:DesignDay, Summer,  !- Design Day Name 

BUT without a RunPeriod or RunPeriodControl object specified

What is actually getting simulated.

When I comment out the one SizingPeriod:DesignDay, the other gets simulated. It's 
a) used in sizing
b) for warming up
c) simulated run

Q1) How do I best simulate both days seperately? Can I run x2 run periods (one for each design day) and will they be seperately warmed up?



------------------------------------

Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/EnergyPlus_Support/

<*> Your email settings:
    Individual Email | Traditional

<*> To change settings online go to:
    http://groups.yahoo.com/group/EnergyPlus_Support/join
    (Yahoo! ID required)

<*> To change settings via email:
    EnergyPlus_Support-digest@xxxxxxxxxxxxxxx 
    EnergyPlus_Support-fullfeatured@xxxxxxxxxxxxxxx

<*> To unsubscribe from this group, send an email to:
    EnergyPlus_Support-unsubscribe@xxxxxxxxxxxxxxx

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/