If I choose:
Yes; !- Do the weather file calculation
I understand that E+ will run all the desing days in the EPW file, besides a annual simulation (or period).
In this case, if I also have chosen:
Yes, !- Do the zone sizing calculation
Yes, !- Do the system sizing calculation
Yes, !- Do the plant sizing calculation
E+ also will run my own desing days defined in the IDF file.
For that, if my own design days in the IDF are the same that the design days in the weather file, E+ is simulating several times the same days.
Yes, !- Do the design day calculation