[EnergyPlus_Support] How to reduce "not met hours"





Dear All,
 
We have an ASHRAE 90 system 8 baseline building.  The E+ model appears to be correct but the "unmet hours" is a little too high.  Cooling and heating unmet both exceed 200.  According to ASHRAE 90, we should increase the system capacity incrementally until unmet (cooling + heating) is below 300.  We changed the sizing factor in Sizing:Parameters but surprisingly found that it had very little effect on the unmet hours.
 
Attached is the IDF file.  Why is that?  What should we do to reduce the unmet hours.  Thank you!
 
XS
 
 





__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___
Attachment not found:
d:\eudora\attach\baseline-final 09-18.idf