Simply declare a zone with heat transfer surfaces and do nothing else. Do not add infiltration, ventilation, or HVAC equipment. Do not use it as an air mixer from other zones.
In the real life, it is still there to conduct heat from the other zones. This is simulated in EPlus. Assign material and construction just as a normal zone, with walls, floor and ceiling. Dr. Li To: EnergyPlus_Support@xxxxxxxxxxxxxxx From: eee.javed@xxxxxxxxx Date: Sat, 19 Nov 2011 12:17:08 +0530 Subject: [EnergyPlus_Support] Unconditioned plenum in Eplus
Hi All,
How to Assign Unconditioned property to the plenum zone?
Thanks in Advance!
Javed Iqbal, LEED AP, CEA Energy Analyst
__._,_.___ Primary EnergyPlus support is found at: http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx The primary EnergyPlus web site is found at: http://www.energyplus.gov The group web site is: http://groups.yahoo.com/group/EnergyPlus_Support/ Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files. EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required) Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe __,_._,___ |