sorry , you mean i could control the plant operation based on the values of other variables bye schedule availablity managers ?
i read in inputoutpur refrence document of e+ that "if the system is to be controlled bye outside dry bulb temperature , an abjectnode list can be used to define a node which will have the current outdoor condition "
could you pleas help me in how i could do it ?
thanks