[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

RE: [EnergyPlus_Support] Re: BMS (Building nergy management system )





Thanks for your quickly answering
 
sorry i most model the plant of building that has a hot water boiler and water heater so in this plant there is no aircoil  and other system that releated to air system , so i think maybe for this plant that only have water system i should use compact schedule that determine the water temperature of node?
 
sorry i have problem  with summary output report : in monthly report for boiler " BOILER GAS  CONSUMPTION RATE {TIMESTAMP}" what is the meaning of timestamp ?and how monthly report calculate ?it 's average of whole month ?
 
thanks
 


__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___