[EnergyPlus_Support] Re: time setpoint not met during cooling hours



Sorry I meant DX Cooling

--- In EnergyPlus_Support@xxxxxxxxxxxxxxx, "iluminasol33" <iluminasol33@...> wrote:
>
> Dear Forum,
> 
> I am modeling a 4 floor building and I am using a single duct parallel PIU reheat terminals and a central two speed DC cooling. The model works properly, except that the amount of hours that the setpoint is not met for cooling during occupied hours is quite big (cooling setpoint: 24 C). First I put the design flow rate and cooling capacity in autosize option and then tried to configure it manually but for both cases its the same amount of hours outside the cooling setpoint.
> 
> Any advice would be greatly appreciated.
> 
> Thanks,
> Santiago
>




------------------------------------

Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/EnergyPlus_Support/

<*> Your email settings:
    Individual Email | Traditional

<*> To change settings online go to:
    http://groups.yahoo.com/group/EnergyPlus_Support/join
    (Yahoo! ID required)

<*> To change settings via email:
    EnergyPlus_Support-digest@xxxxxxxxxxxxxxx 
    EnergyPlus_Support-fullfeatured@xxxxxxxxxxxxxxx

<*> To unsubscribe from this group, send an email to:
    EnergyPlus_Support-unsubscribe@xxxxxxxxxxxxxxx

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/