Try with the sizing factors. Or modify your cooling setpoint.
To: EnergyPlus_Support@xxxxxxxxxxxxxxx From: iluminasol33@xxxxxxxxx Date: Fri, 6 Jan 2012 17:48:10 +0000 Subject: [EnergyPlus_Support] time setpoint not met during cooling hours
Dear Forum,
I am modeling a 4 floor building and I am using a single duct parallel PIU reheat terminals and a central two speed DC cooling. The model works properly, except that the amount of hours that the setpoint is not met for cooling during occupied hours is quite big (cooling setpoint: 24 C). First I put the design flow rate and cooling capacity in autosize option and then tried to configure it manually but for both cases its the same amount of hours outside the cooling setpoint. Any advice would be greatly appreciated. Thanks, Santiago __._,_.___ Primary EnergyPlus support is found at: http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx The primary EnergyPlus web site is found at: http://www.energyplus.gov The group web site is: http://groups.yahoo.com/group/EnergyPlus_Support/ Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files. EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required) Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe __,_._,___ |