[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[EnergyPlus_Support] to verify that your system model works fine
- To: EnergyPlus_Support@xxxxxxxxxxxxxxx
- Subject: [EnergyPlus_Support] to verify that your system model works fine
- From: "brainwt" <deukwookim@xxxxxxxx>
- Date: Fri, 27 Jan 2012 11:01:11 -0000
- Delivered-to: mailing list EnergyPlus_Support@xxxxxxxxxxxxxxx
- Delivery-date: Fri, 27 Jan 2012 04:01:16 -0700
- Dkim-signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=yahoogroups.com; s=lima; t=1327662074; bh=J/WHyIUflZ2Sv4AjB1ydSjqgKfdxoDOR+gPIbMe2SCI=; h=Received:Received:Received:X-Yahoo-Newman-Id:X-Sender:X-Apparently-To:X-Received:X-Received:X-Received:X-Received:X-Received:X-Received:To:Message-ID:User-Agent:X-Mailer:X-Originating-IP:X-eGroups-Msg-Info:X-Yahoo-Post-IP:From:X-Yahoo-Profile:Sender:MIME-Version:Mailing-List:Delivered-To:List-Id:Precedence:List-Unsubscribe:Date:Subject:Reply-To:X-Yahoo-Newman-Property:Content-Type; b=Dg56rpQ4mxM+/H4BmVmcU4dxaPfGlmmVNcC3aLCZLep0G/pkczt+nhHaqMRWiuXRxQZhmvN9tewRPWIlP5ByO1j24IulXn18D1Nj8fx5ji1qtoXNyR5gH7y9JBYJ42dh
- Domainkey-signature: a=rsa-sha1; q=dns; c=nofws; s=lima; d=yahoogroups.com; b=VpFmGYsoS/PnYXWETVDEoR2WKtXBn2wya0Jvhgv8yUg9J8BQHbbmpyM2GNZGx+PtgsmN+DYAE/X1uXjhs+kS/iBbFvnfvrLa4IoMrJvSq3luCtkTYRbdJVUPaxYmqWX5;
- Envelope-to: linda@xxxxxxxxxxxxxx
- List-id: <EnergyPlus_Support.yahoogroups.com>
- List-unsubscribe: <mailto:EnergyPlus_Support-unsubscribe@yahoogroups.com>
- Mailing-list: list EnergyPlus_Support@xxxxxxxxxxxxxxx; contact EnergyPlus_Support-owner@xxxxxxxxxxxxxxx
- Reply-to: EnergyPlus_Support@xxxxxxxxxxxxxxx
- Sender: EnergyPlus_Support@xxxxxxxxxxxxxxx
- User-agent: eGroups-EW/0.82
Dear users,
I am wondering what kind of model checking process you have after HVAC system simulation.
In other words,
"At first" what do you usually do to verify that your system model works fine ?
Check lists would be,
0. System and plant and zone sizing objects are properly inputted.
1. Conditioned zone temperature is well controlled, (thermal comfort)
2. Supply air temperature of AHU is well controlled,
3. Dampers are well controlled (Economizer control),
4. Supply water temperature of the boiler and chiller is well controlled,
In the case of common VAV system (boiler, electric chiller, condenser), I usually have checked all system node temperatures and mass flow rates and setpoint managers.
Is that all?
Is there anyone who can suggest me systematic analysis process? or any references?
Any information on this topic would be appreciated.
Deuk-Woo, Kim
__._,_.___
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
__,_._,___