Hi,allThere are several chillers and pumps in the plant. It is a constant primary chilled water system. I want to simulate the chillers and pumps operate on a time schedule. It means, for instance, at 8:00 chiller1, chiller2, pump1 and pump2 operate, at 10:00 chiller 1~4 and pump 1~4 operate. The chillers and pumps operate at the time schedule regardless of the cooling load operation scheme.