Re: Fw: [EnergyPlus_Support] pv electricity produded
Hi,
Divide Joules by (3600*1000) and obtain kWh.
--- In EnergyPlus_Support@xxxxxxxxxxxxxxx, Thodwris Xaritidis <maki_to_fai@...> wrote:
>
>
>
>
>
>
>
> Hello,
>
> If I want to find out the amount of electricity produced by my PV in WATTS
>
> which is the option? I have only found total pv electricity produced but in JOULES.
>
> thank you
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
> ----- Forwarded Message -----
> From: Ayzer Akguc <alpayakguc@...>
> To: "EnergyPlus_Support@xxxxxxxxxxxxxxx" <C>
> Sent: Thursday, 12 July 2012, 14:52
> Subject: Re: [EnergyPlus_Support] Setpoint Manager
>
>
> Â
> Hi Karen,
> Â
> Thanks for your attention.
> Â
> I did your sugesstion. I used "AirLoop Supply Side Outlet Node" as node name in SetpointManager:Scheduled. I also wonder the sequensing of the fan, cooling coil and heating coil in VAV. Is there any importance of sequensing when I use "AirLoop Supply Side Outlet Node" as node name ? Now, the sequensing is fan, cooling coil then heating coil in my model. I mean, "AirLoop Supply Side Outlet Node" is the outlet air node of heating coil in my model.
> Â
> Best regards
> Â
> Alpay
> Â
> From: Karen Walkerman <kwalkerman@...>
> To: EnergyPlus_Support@xxxxxxxxxxxxxxx
> Sent: Thursday, July 12, 2012 4:25 PM
> Subject: Re: [EnergyPlus_Support] Setpoint Manager
>
>
> Â
> Hi Alpay,
>
> For a VAV system with reheat, generally the central air system (AirLoopHVAC) provides cool air to every zone, and the reheat coils in the VAV boxes in the zone reheat the air to meet the setpoint temperature of each zone.
>
> If you want to use SetpointManager:Scheduled to control the air temperature of the AirLoop, usually the AirLoop Supply Side Outlet Node is used as the setpoint.
>
> For this system, you might also want to look at SetpointManager:SingleZone:Cooling and SetpointManager:MultiZone:Cooling. Â These setpoint managers vary the airloop outlet temperature based on the cooling needs of the zone or zones served.
>
> --
> Karen
>
>
> On Thu, Jul 12, 2012 at 8:01 AM, Ayzer Akguc <alpayakguc@...> wrote:
>
>
> >Â
> >Hi,
> >Â
> >I would like to know the working of SetpointManager:Scheduled. How can I control the heating and cooling of VAV using SetpointManager:Scheduled ? Which node name should be written at "Setpoint Node or Nodelist Name" in SetpointManager:Scheduled for heating and cooling ?
> >Â
> >Best regards
> >Â
> >Alpay Akgüç
>
------------------------------------
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Yahoo! Groups Links
<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/EnergyPlus_Support/
<*> Your email settings:
Individual Email | Traditional
<*> To change settings online go to:
http://groups.yahoo.com/group/EnergyPlus_Support/join
(Yahoo! ID required)
<*> To change settings via email:
EnergyPlus_Support-digest@xxxxxxxxxxxxxxx
EnergyPlus_Support-fullfeatured@xxxxxxxxxxxxxxx
<*> To unsubscribe from this group, send an email to:
EnergyPlus_Support-unsubscribe@xxxxxxxxxxxxxxx
<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/