IP Units are supported through post processing program
(EP-Launch option) for .csv files and Output:Table:Style for the tabular
reports.
At 08:23 AM 7/12/2012, Thodwris Xaritidis wrote:
Hello,
If I want to find out the amount of electricity produced by my PV in
WATTS
which is the option? I have only found total pv electricity produced but
in JOULES.
I did your sugesstion. I used "AirLoop Supply Side Outlet Node"
as node name in SetpointManager:Scheduled. I also wonder the sequensing
of the fan, cooling coil and heating coil in VAV. Is there any importance
of sequensing when I use "AirLoop Supply Side Outlet Node" as
node name ? Now, the sequensing is fan, cooling coil then heating coil in
my model. I mean, "AirLoop Supply Side Outlet Node" is the
outlet air node of heating coil in my model.
Best regards
Alpay
From: Karen Walkerman
<kwalkerman@xxxxxxxxx> To: EnergyPlus_Support@xxxxxxxxxxxxxxx Sent: Thursday, July 12, 2012 4:25 PM Subject: Re: [EnergyPlus_Support] Setpoint Manager
Hi Alpay,
For a VAV system with reheat, generally the central air system
(AirLoopHVAC) provides cool air to every zone, and the reheat coils in
the VAV boxes in the zone reheat the air to meet the setpoint temperature
of each zone.
If you want to use SetpointManager:Scheduled to control the air
temperature of the AirLoop, usually the AirLoop Supply Side Outlet Node
is used as the setpoint.
For this system, you might also want to look at
SetpointManager:SingleZone:Cooling and
SetpointManager:MultiZone:Cooling. These setpoint managers vary the
airloop outlet temperature based on the cooling needs of the zone or
zones served.
I would like to know the working of SetpointManager:Scheduled. How
can I control the heating and cooling of VAV using
SetpointManager:Scheduled ? Which node name should be written at
"Setpoint Node or Nodelist Name" in SetpointManager:Scheduled