Matthew,
What do you expect an Output:Variable or Meter to do that is not done in the Report?
James V Dirkes II, PE, BEMP, LEED AP
www.buildingperformanceteam.com
Energy Analysis, Commissioning & Training Services
1631 Acacia Drive, Grand Rapids, MI 49504 USA
616 450 8653
From: EnergyPlus_Support@xxxxxxxxxxxxxxx [mailto:EnergyPlus_Support@xxxxxxxxxxxxxxx] On Behalf Of ntraughpee
Sent: Thursday, October 11, 2012 11:04 AM
To: EnergyPlus_Support@xxxxxxxxxxxxxxx
Subject: [EnergyPlus_Support] Cost in Output:Meter or Output:Variable
Hello everybody,
So I have added a UtilityCost:Tariff and UtilityCostCharge:Simple and in the HTML output I can see the cost and by applying the per unit energy charges to the CSV output of the monthly totals I can see that the costs indicated in the HTML output are correct.
Right now I am looking for an Output:Meter or Output:Variable so I can see what the operating cost is for a building in terms of $. I spent a little time and couldn't find this, does it exist and if it does, where is it?
__._,_.___
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe
__,_._,___