[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[EnergyPlus_Support] Re: proposed desing CS proyect
- To: EnergyPlus_Support@xxxxxxxxxxxxxxx
- Subject: [EnergyPlus_Support] Re: proposed desing CS proyect
- From: "andresdagm" <andresdagm@xxxxxxxxx>
- Date: Wed, 28 Nov 2012 16:07:46 -0000
- Delivered-to: mailing list EnergyPlus_Support@xxxxxxxxxxxxxxx
- Delivery-date: Wed, 28 Nov 2012 09:07:53 -0700
- Dkim-signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=yahoogroups.com; s=echo; t=1354118869; bh=3kZoGdwLJbfqlrmht2jHv0tkNKEc6zzrH/U156kS93s=; h=Received:Received:X-Yahoo-Newman-Id:X-Sender:X-Apparently-To:X-Received:X-Received:X-Received:X-Received:X-Received:To:Message-ID:In-Reply-To:User-Agent:X-Mailer:X-Originating-IP:X-eGroups-Msg-Info:X-Yahoo-Post-IP:From:X-Yahoo-Profile:Sender:MIME-Version:Mailing-List:Delivered-To:List-Id:Precedence:List-Unsubscribe:Date:Subject:Reply-To:X-Yahoo-Newman-Property:Content-Type:Content-Transfer-Encoding; b=Npq8pmdl7WlrDZNflG6q4ZAdcWx2+OSB8coJGO575NfPEokmgQon//WVme5jpfOpBgBSfZpVEpEtWT6bTGezQ0ON90c/WqLxc0Sxj6bg9qKx9oXgJUxsIxNGZLyX0ywV0oc54OCJ1xpRJlFsR3z6PdNL1Qj0VreiVaUEfUPYb5A=
- Domainkey-signature: a=rsa-sha1; q=dns; c=nofws; s=echo; d=yahoogroups.com; b=oZHkrlX8vRZs6y2F8j0SATVdbL0OyGMjt2bx3IfGfl3G1EuHw7GJ2U2eJTkCw4kBpt+1WciG0QzehDR0R219q1rmUVfSRatwLpL7rY0RLFZ76ck8lhMk69rwLCaqYMDyf49tulh+a1QA1Ew8BAkLS3o19/gP9rteoZFWHCoCJXg=;
- Envelope-to: linda@xxxxxxxxxxxxxx
- In-reply-to: <CAAGg3bxkSeYy2E46315hsx-XXc4z5KSajsnO411Mim2k=5G9RQ@mail.gmail.com>
- List-id: <EnergyPlus_Support.yahoogroups.com>
- List-unsubscribe: <mailto:EnergyPlus_Support-unsubscribe@yahoogroups.com>
- Mailing-list: list EnergyPlus_Support@xxxxxxxxxxxxxxx; contact EnergyPlus_Support-owner@xxxxxxxxxxxxxxx
- Reply-to: EnergyPlus_Support@xxxxxxxxxxxxxxx
- Sender: EnergyPlus_Support@xxxxxxxxxxxxxxx
- User-agent: eGroups-EW/0.82
Hi all group,
thank for the answer,
I have ran my model but it have more that 300 hours not met (about 3000). I think that it is because my CAV systems have been designed to supply just the outdoor air requered and when it pass through the cooling coils it is not enough to cold the zones.
I dont know what to do on it, it is a issue that my proposed model is not completed designed
Thank you
Dante
--- In EnergyPlus_Support@xxxxxxxxxxxxxxx, Jean Marais <jeannieboef@...> wrote:
>
> I ran this past some other leed experts. It appears you are supposed to
> complete the undesigned part of the hvac in the buildout zones with as
> close to the baseline systems in the norm as possible...most important is
> to keep them as thermodynamically similar as possible.
>
> On 20 November 2012 21:51, andresdagm <andresdagm@...> wrote:
>
> > **
> >
> >
> > thank you, sorry for my not well explanation.
> > Baseline is system 8, one VAV per floor.
> > For the proposed i have injector fans, they will supply outdoor air to
> > each zone, there will be chiller and duct but without any coil. tenat will
> > install the coils.
> > So, (option)what i have modeled is the injector fans, and there include a
> > coil of cold water and in each zone include the paralel box like in the
> > baseline.
> > Another way (option 2)that i can model is model VAV that will supply
> > outdoor air and cooling equal than in my baseline, but, what about my
> > injector fans that will supply outdoor air (i can simulate it double).
> >
> > i dont know wheter option 1 or potion 2 is correct.
> > thank you
> > Dante
> >
> >
> > --- In EnergyPlus_Support@xxxxxxxxxxxxxxx, Jean Marais <jeannieboef@>
> > wrote:
> > >
> > > If the HVAC is not designed then you should model the baseline system in
> > > the proposed case. I can double check this for you, but that is how I
> > read
> > > it.
> > >
> > > On 20 November 2012 21:31, andresdagm <andresdagm@> wrote:
> > >
> > > > **
> >
> > > >
> > > >
> > > >
> > > > Thank you, the baseline case is already modeled. My question is about
> > the
> > > > proposed building because it is not completed designed and i am not
> > sure if
> > > > i am modelling it correct or not.
> > > >
> > > > --- In EnergyPlus_Support@xxxxxxxxxxxxxxx, jeannieboef <jeannieboef@>
> > > > wrote:
> > > > >
> > > > > The design case is modeled as designed. The baseline case system
> > > > > selection is mainly based on the fuel type used in the proposed
> > design
> > > > > for heating. See the norm for selection. It is just one "dominant"
> > > > > system and not mixed, unless one or more of the exceptions apply.
> > > > >
> > > > > Sent from my iPhone
> > > > >
> > > > > On 20.11.2012, at 17:58, "andresdagm" <andresdagm@> wrote:
> > > > >
> > > > > > My proposed desing has a mechanical ventilation system, there are
> > > > > > injector fan that will provide outdoor air to each zone. There are
> > > > > > one injector per vertical duct. Furthermore, no coils have been
> > > > > > designed, just there will be chillers and each tenant will install
> > > > > > their coils. (Surely, There will be fancoils but it won't be in any
> > > > > > lease agreement and it is not designed)
> > > > > > I think that I need to make a mix between the proposed and baseline
> > > > > > (system 8), I will model the injector fans and I will include coils
> > > > > > of cold water, in each zone I will install a parallel piu reheat
> > > > > > like in the baseline, I don't know if it is right or not???,
> > because
> > > > > > in the baseline I have VAV systems, and one per floor, and in my
> > > > > > proposed I am modeling CAVs (the injector fan are constants.)
> > > > > >
> > > > > > I really appreciate your help and corrections.
> > > > > > Dante GarcÃa
> > > > > >
> > > > > >
> > > > >
> > > >
> > > >
> > > >
> > >
> >
> >
> >
>
------------------------------------
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Yahoo! Groups Links
<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/EnergyPlus_Support/
<*> Your email settings:
Individual Email | Traditional
<*> To change settings online go to:
http://groups.yahoo.com/group/EnergyPlus_Support/join
(Yahoo! ID required)
<*> To change settings via email:
EnergyPlus_Support-digest@xxxxxxxxxxxxxxx
EnergyPlus_Support-fullfeatured@xxxxxxxxxxxxxxx
<*> To unsubscribe from this group, send an email to:
EnergyPlus_Support-unsubscribe@xxxxxxxxxxxxxxx
<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/