Hi everybody!
I need to simulate a double glazing facade on my five stores office building. After I designed it with Open Studio, how can I manage the air-flow rate through this ventilated facade?
Thank you for any suggestion
--Javed Iqbal, LEED AP, CEAEnergy Analyst
__._,_.___