Thank you, I would like to try that, maybe for three months time period. How do I change that, that is, change the sizing period duration?

Thank you so much for your help!

On Jul 30, 2013 10:34 PM, "Linda Lawrie" <linda@xxxxxxxxxxxxxx> wrote:
 

The zone component loads summary is only available if you are doing a sizing run.

I suppose if you really want to increase your run time, you could run the full year as a sizing period (SizingPeriod:WeatherFileDays)  But I do not know if it will work.

EnergyPlus Development Team



__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___