[EnergyPlus_Support] PlantEquipmentOperationScheme [1 Attachment]





Hi, I have some problem with the PlantEquipmentOperationScheme. I read in the I/O Reference that if I choose the PlantEquipmentOperationControl:CoolingLoad and PlantEquipmentOperationControl:HeatingLoad, I have to define a range of load in with this two loops have to work.
Anyway I cannot understand how do I have to model the "Control Scheme 1 Schedule": what does it have to do?
thanks
Maria



__._,_.___
View attachments on the web

Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___
Attachment not found:
d:\eudora\attach\Control-Scheme.png