[EnergyPlus_Support] ASHRAE 90.1 Building Envelope 'Slab-on-grade floors'
- To: <EnergyPlus_Support@xxxxxxxxxxxxxxx>
- Subject: [EnergyPlus_Support] ASHRAE 90.1 Building Envelope 'Slab-on-grade floors'
- From: <seanking.1970@xxxxxxxxxxx>
- Date: 08 Nov 2013 05:42:43 -0800
- Delivered-to: mailing list EnergyPlus_Support@xxxxxxxxxxxxxxx
- Delivery-date: Fri, 08 Nov 2013 06:42:47 -0700
- Dkim-signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=yahoogroups.com; s=echoe; t=1383918164; bh=ZB1ognUWb/Ag844l4l/JFrVmypae/Ob5jE/8S8/7NyE=; h=Received:Received:X-Yahoo-Newman-Id:X-Sender:X-Apparently-To:X-Received:X-Received:X-Received:X-Received:X-Received:X-Received:X-Received:To:Message-ID:X-Mailer:X-Originating-IP:X-eGroups-Msg-Info:X-Yahoo-Post-IP:From:X-Yahoo-Profile:Sender:MIME-Version:Mailing-List:Delivered-To:List-Id:Precedence:List-Unsubscribe:Date:Subject:Reply-To:X-Yahoo-Newman-Property:Content-Type; b=11/tObGsx3K308KflfDVxmHNlM3GDMvev+/XmPEGP5HojoZs7mKX4mIXFxlP6llAiqVSgrhfcDscDVsX4dpkQNtm+d3Jr9cp0K/oZTQFjImre5JQoHBxUDVagcErqVJ18F5CeI6miaXC62sFxgjI8lz0g24OVMnxYvhIaAG4xfM=
- Domainkey-signature: a=rsa-sha1; q=dns; c=nofws; s=echoe; d=yahoogroups.com; b=b+8Oaon9+F3MdttlGjlndFv77GA9PFLgtfCCMf1AKCV9hRH+Hz3bS51+D+cvQO/V3E+JbvE3MgmXvtqYA4862ZGu4mslbKnqwt5+HDMeGOh5NxQkv3k+v9C617kzau5wx8UPABDtpA+Q6FzsHEiY2gwY3VQzw+qQGp+xHlwu+tI=;
- Envelope-to: linda@xxxxxxxxxxxxxx
- List-id: <EnergyPlus_Support.yahoogroups.com>
- List-unsubscribe: <mailto:EnergyPlus_Support-unsubscribe@yahoogroups.com>
- Mailing-list: list EnergyPlus_Support@xxxxxxxxxxxxxxx; contact EnergyPlus_Support-owner@xxxxxxxxxxxxxxx
- Reply-to: EnergyPlus_Support@xxxxxxxxxxxxxxx
- Sender: EnergyPlus_Support@xxxxxxxxxxxxxxx
Dear EneryPlus experts,
In ASHRAE Standard 90.1 2007, I am sure the term 'Floor' shown in Tables 5.5-1 through 5.5-8 means 'Ground floor' construction.
I can see in Appendix G Table G3.1 the constructions for new buildings (baseline) must use 'Floors - Steel-joist'. This table as well defines "Slab-on-grade floors shall match the F-factor for unheated slabs from the same tables (imply Tables 5.5-1 through 5.5-8)".
My question is: if 'slab-on-grade floors' also mean ground floors, to what extent (where it would most possibly be) for these constructions to apply in baseline model?
It seems for new buildings (baseline) the only required opaque constructions would be: Roofs - Insulation entirely above deck, Above-grade-walls - Steel-framed, Floors - Steel-joist and opaque doors.
I look forward to receiving any comment/advice.
Best regards,
Sean
__._,_.___
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
__,_._,___