Look at the simulation control and tell if run simulation for sizing periods its "yes" or "no"
On Feb 11, 2014 4:50 PM, "Steven Herek" <
brick_13_13@xxxxxxxxx> wrote:
No matter what I do to the design period it still only does simulations for one day in January and one in July. When I change the output to monthly it changes the names to January and July, but it is still only for those two days. Could you possibly look at the file and see what I need to do differently?
Thank you
Look at the eplus simulations parameters. Run simulation for design periods.
Good luck
On Feb 11, 2014 1:53 PM, <
brick_13_13@xxxxxxxxx> wrote:
I am struggling quite a bit with what seem to be basics. While running the example file AirflowNetwork_Multizone_House.idf I cannot figure out how to change the outputs, no matter what I add or change I cannot seen to see differences. I am concerned with the meter output, I want simple monthly energy uses, but I want them for the full year, not just the design days. Can anyone check out this example file and let me know what I need to do for a full years meter file?