[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[EnergyPlus_Support] ElectricLoadCenter:Storage:Battery Changing/Discharging Schedule
- To: <EnergyPlus_Support@xxxxxxxxxxxxxxx>
- Subject: [EnergyPlus_Support] ElectricLoadCenter:Storage:Battery Changing/Discharging Schedule
- From: "xiwangli2010@xxxxxxxxx [EnergyPlus_Support]" <EnergyPlus_Support@xxxxxxxxxxxxxxx>
- Date: 11 Jul 2014 11:19:32 -0700
- Delivered-to: mailing list EnergyPlus_Support@xxxxxxxxxxxxxxx
- Delivery-date: Fri, 11 Jul 2014 12:19:42 -0600
- Dkim-signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=yahoogroups.com; s=echoe; t=1405102772; bh=iW5wUX+NPJLGu6gmMWocj4pkR0A6mr0w1yHirXf/7cU=; h=Received:Received:X-Yahoo-Newman-Id:X-Sender:X-Apparently-To:X-Received:X-Received:X-Received:X-Received:X-Received:X-Received:X-Received:To:Message-ID:X-Mailer:X-Original-From:X-Originating-IP:X-eGroups-Msg-Info:X-Yahoo-Post-IP:From:X-Yahoo-Profile:Sender:MIME-Version:Mailing-List:Delivered-To:List-Id:Precedence:List-Unsubscribe:Date:Subject:Reply-To:X-Yahoo-Newman-Property:Content-Type; b=bDxyacwObfcpE2vz1U3dzh12t73LjaghaZGKeHL5h/MG1LrkvvdvhP5MyVcEzvJ7PGqcxqrCeD3VFJ9vAHyDRUvoBvxdMYcKe3GUBUWUbYPtk6nRz+3pRNSHT47cRq1tqJexlZNRMKLdd8C99asHMgq2btdBUyoHd3VFK9oEcd0=
- Domainkey-signature: a=rsa-sha1; q=dns; c=nofws; s=echoe; d=yahoogroups.com; b=ZqGEwahMKoAdLba15kZ29lu6T/aheKPuqItmaNo6jUDpFiOU2MtQ3Hz8h8Pfj07rI2g9r9dB40XFfJcCgvdnFsaQeBSUQ+3HKz78W+5FSGSiRttt9AZ67ZBriaLvqEh00gk3Woye6YcH2kVkpiLsA9YyM42lpAFOpnpJy5IOGSc=;
- Envelope-to: linda@xxxxxxxxxxxxxx
- List-id: <EnergyPlus_Support.yahoogroups.com>
- List-unsubscribe: <mailto:EnergyPlus_Support-unsubscribe@yahoogroups.com>
- Mailing-list: list EnergyPlus_Support@xxxxxxxxxxxxxxx; contact EnergyPlus_Support-owner@xxxxxxxxxxxxxxx
- Reply-to: EnergyPlus_Support@xxxxxxxxxxxxxxx
Hi, all
I want to control the battery charging/ discharging schedule. However, the Electricload Center: Distribution dosn't allow any user defined operation schedule.
"The basic storage control algorithm is to compare the requested
generator electricity loads to the current available supply and make up the difference with
storage. If extra power is generated, then store it. If there is a shortage, then attempt to draw
from storage to meet the remaining electricity request."
Does any know how to determine the battery operation schedule. Any clue?
Thanks very much.
Xiwang Li
__._,_.___
Posted by: xiwangli2010@xxxxxxxxx
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
__,_._,___