RE: [EnergyPlus_Support] ElectricLoadCenter:Storage:Battery Changing/Discharging Schedule





Try the ElectricEquipment object!

 

James V Dirkes II, PE, BEMP, LEED AP
www.buildingperformanceteam.com
Energy Analysis, Commissioning & Training Services
1631 Acacia Drive, Grand Rapids, MI 49504 USA
616 450 8653

 

From: EnergyPlus_Support@xxxxxxxxxxxxxxx [mailto:EnergyPlus_Support@xxxxxxxxxxxxxxx]
Sent: Friday, July 11, 2014 2:20 PM
To: EnergyPlus_Support@xxxxxxxxxxxxxxx
Subject: [EnergyPlus_Support] ElectricLoadCenter:Storage:Battery Changing/Discharging Schedule

 

 

Hi, all

I want to control the battery charging/ discharging schedule. However, the Electricload Center: Distribution dosn't allow any user defined operation schedule.

 

"The basic storage control algorithm is to compare the requested
generator electricity loads to the current available supply and make up the difference with
storage. If extra power is generated, then store it. If there is a shortage, then attempt to draw
from storage to meet the remaining electricity request."

 

 

Does any know how to determine the battery operation schedule. Any clue?

 

Thanks very much.

 

Xiwang Li

 



__._,_.___

Posted by: Jim Dirkes <jim@xxxxxxxxxxxxxxxxxxxxxxxxxxx>


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.





__,_._,___