[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [EnergyPlus_Support] Re: Processing multiple years in epw





That may have been true at the time.  I believe we added the "repeat" field to the regular RunPeriod and then, as Jim says, at Jim's suggestion we added the CustomRange for handling multiple year (usually real) data in a more recent version.

You could look at the features tracking on the website to understand when it was added.

At 08:05 AM 11/8/2014, ruiigreja@xxxxxxxxx [EnergyPlus_Support] wrote:


Have a look at this thesis "Modeling, Verification and Optimization of Hybrid Ground Source Heat Pump Systems in Energyplus": http://hdl.handle.net/11244/10018.

As far as I understood, at the time the thesis was written (2005) the possibiliity of e+ doing multi-year simulations didn't exist ... and the guy had to make changes to the code and had to add the field "Number of simulation years" to the IDD file.


__._,_.___

Posted by: Linda Lawrie <linda@xxxxxxxxxxxxxx>


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Visit Your Group
Yahoo! Groups
• Privacy • Unsubscribe • Terms of Use

__,_._,___