[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: [EnergyPlus_Support] Re: Processing multiple years in epw
That may have been true at the time. I believe we
added the "repeat" field to the regular RunPeriod and then, as
Jim says, at Jim's suggestion we added the CustomRange for handling
multiple year (usually real) data in a more recent version.
You could look at the features tracking on the website to understand when
it was added.
At 08:05 AM 11/8/2014, ruiigreja@xxxxxxxxx [EnergyPlus_Support]
wrote:
Have a look at this thesis
"Modeling, Verification and Optimization of Hybrid Ground Source
Heat Pump Systems in Energyplus":
http://hdl.handle.net/11244/10018.
As far as I understood, at the time the thesis was written (2005) the
possibiliity of e+ doing multi-year simulations didn't exist ... and the
guy had to make changes to the code and had to add the field "Number
of simulation years" to the IDD file.
__._,_.___
Posted by: Linda Lawrie <linda@xxxxxxxxxxxxxx>
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
__,_._,___