Hi All,
Iâ??m currently modelling health/research based building for
LEED certification. This building uses a base-load VAV system but as
there are many process loads present in such a building (e.g. microscope rooms,
freezer rooms, glass washing, etc.) there are many spaces that will make
use of supplemental cooling units (FCU/PAC units) to remove additional
heat.
1.
Does anyone have any experience with a similar
situation?
2.
Do
we need to include the process loads and the systems that are installed to
serve them?
3. What
is the easiest way to model this situation using Energy Plus (two air-side
systems in one zone)?
Thanks,
John