[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[EnergyPlus_Support] LEED for labs; process loads and two air-side systems





Hi All,
 
Iâ??m currently modelling health/research based building for LEED certification.  This building uses a base-load VAV system but as there are many process loads present in such a building (e.g. microscope rooms, freezer rooms, glass washing, etc.)  there are many spaces that will make use of supplemental cooling units (FCU/PAC units) to remove additional heat. 
 
1.      Does anyone have any experience with a similar situation?
2.      Do we need to include the process loads and the systems that are installed to serve them?
3.       What is the easiest way to model this situation using Energy Plus (two air-side systems in one zone)?
 
Thanks,
John  



__._,_.___

Posted by: John Dedman <jdeds91@xxxxxxxxxxxx>


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Visit Your Group
Yahoo! Groups
PrivacyUnsubscribeTerms of Use

__,_._,___