Dear Justin, I think you need modelling the project and create schedules in accordance with the fare levels mentioned. For this reason, an alternative would be the use of neural networks, where the automation of the process learns with the conditions "if" and "then". Thus, by combining routine programming that was prevalent in IDF, and using a midleware (such as MATLAB � MATrix LABoratory), modifying it accordingg to what would be "understood" each time, I believe that obterias the desired result. Regards, Arq Carlos Krebs LEED® Accredited Professional Auditor Interno ISO 14.001 KREBS SUSTENTABILIDADE (51) 8196-8255 (53) 8119-0003 __._,_.___ Posted by: Carlos Krebs <clmkrebs@xxxxxxxxxxxx> Primary EnergyPlus support is found at: http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx The primary EnergyPlus web site is found at: http://www.energyplus.gov The group web site is: http://groups.yahoo.com/group/EnergyPlus_Support/ Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files. EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button. __,_._,___ |