[EnergyPlus_Support] UNMET HOURS: Tolerance for setpoint not met time





Hi, 


I am dealing with the unmet load hours in my project for the proposed model. I have done almost all the strategies I have found (schedules, setpoint, etc.), all this has helped but it is not enought yet. I have 140 hours in my baseline model so at least I have to reach 190 hours in my proposed model, right now I have 385 hours. 


I know I can change the tolerance for zone cooling setpoint not met time from 0.5 (actual value) to a higher value as a last resource. Before doing this, I would like to know if there is a maximum value or limit for this according to ASHRAE 90.1-2007 or LEED? 


Thank you, 




__._,_.___

Posted by: delapenamariajose@xxxxxxxxx


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Visit Your Group
Yahoo! Groups
• Privacy • Unsubscribe • Terms of Use

__,_._,___