I agree with the experts here. Autosize for existing building retrofit and associated simulation is real tough challenge. Instead running default values, it's is better to input actual data and site level observations. For data that is unavailable one can have a some assumptions and comparative data for nAn values. It's is always cost effective and provide better result through hard-sizing. -Arun ECUBE solution Bengaluru Sent from my iPhone On 16-Jun-2015, at 11:39 PM, "m.waseemahmad@xxxxxxxxxxx [EnergyPlus_Support]" <EnergyPlus_Support@xxxxxxxxxxxxxxx> wrote:
__._,_.___ Posted by: Arun <arynum@xxxxxxxxxxx> Primary EnergyPlus support is found at: http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx The primary EnergyPlus web site is found at: http://www.energyplus.gov The group web site is: http://groups.yahoo.com/group/EnergyPlus_Support/ Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files. EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button. __,_._,___ |