[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[EnergyPlus_Support] Re: Room Air Modeling
After reading much more, the problem is fairly obvious. E+ solves an ODE for the load to determine the required mass flow rate/supply temperature to meet load requirements. This process iterates until "setpoint" is met (i.e. average air temp = setpoint setting). "Setpoint" acts as more of a stopping criteria for the air loop than a controlled variable.
With the problem found, can anybody recommend a solution? I'm able to modify source code if necessary.
__._,_.___
Posted by: ryanwalterkennett@xxxxxxxxx
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
__,_._,___