[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[EnergyPlus_Support] Too much Simulation Time
Hi,
I am running E+(ver 8.4) simulation on a building with
1. Building area: 117 sqm
2. Conditioned volume: 360 m3
3. PCM on roof: 90 sqm
4. Number of surfaces: 90
5. Conduction finite difference method, so 20 timesteps
6. Each construction has some 7-8 layers
6. Laptop with 4 cores
Even for 1-month runtime it's taking more than 90 mins. Can anyone suggest how can I reduce simulation time. I know reducing the layers in construction is one, but I want to keep that solution the last one.
__._,_.___
Posted by: gauravciitr@xxxxxxxxx
EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The EnergyPlus web site is found at:
http://www.energyplus.net/
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
__,_._,___