[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[EnergyPlus_Support] Too much Simulation Time





Hi,

I am running E+(ver 8.4) simulation on a building with

1. Building area: 117 sqm

2. Conditioned volume: 360 m3

3. PCM on roof: 90 sqm

4. Number of surfaces: 90

5. Conduction finite difference method, so 20 timesteps

6. Each construction has some 7-8 layers


6. Laptop with 4 cores


Even for 1-month runtime it's taking more than 90 mins. Can anyone suggest how can I reduce simulation time. I know reducing the layers in construction is one, but I want to keep that solution the last one.



__._,_.___

Posted by: gauravciitr@xxxxxxxxx


EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The EnergyPlus web site is found at:
http://www.energyplus.net/

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Visit Your Group
Yahoo! Groups
PrivacyUnsubscribeTerms of Use

__,_._,___