ÂHi all,
I meet difficulty to model ASHRAE 90.1 baseline system #1 (packaged terminal air conditioner) in EnergyPlus to match minimum outdoor ventilation rate with proposed design, which is required by 2007 version G3.1.2.5. My proposed design requires the ventilation of outdoor air flow during occupied hours, but needs to set OA flow rate to 0 during unoccupied hours.
It looks like this cannot be controlled in terms of using schedules in EnergyPlus. My question is, if it is possible for me to use an AHU (CAV, DX cooling coil, hot water coil) in baseline model instead of a PTAC system so that LEED could take it as a valid approach?
I would like very much to receive advice/comments from your experience gained from LEED projects. Thank you very much indeed.
Sean
--James V Dirkes II, PE, BEMP, LEED AP
CEO/President
The Building Performance Team Inc.
1631 Acacia Dr, GR, Mi 49504
Direct: 616.450.8653
jim@buildingperformanceteam.com
Website l  LinkedIn | May 2016 ASHRAE Journal article on energy modeling
When shouldering your personal pack of life's burdens, bring a pocket full of grit and a bucket full of joy.