[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[EnergyPlus_Support] outdoor air mehod: ProportionalControlBasedonOccupancySchedule





Hello All,

I need to change outdoor air method to based on the real occupancy at each timestep. I adjust this in "DesignSpecification:OutdoorAir" and "Controller:MechanicalVentilation".

I'd like to check how it works. Which output variable is appropriate for this purpose?

Thank you.

 



__._,_.___

Posted by: my_sunny_night@xxxxxxxxx


EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The EnergyPlus web site is found at:
http://www.energyplus.net/

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Visit Your Group
Yahoo! Groups
• Privacy • Unsubscribe • Terms of Use

__,_._,___