I'm using eQUEST 2.2 to model a 7-story building, 400,000 sf, with 2
chillers and a cooling tower. When I run a simulation and check the
PS-C report it shows that the chillers are not even running. I've
checked the internal load schedules as well as various load reports and
they are showing that a substantial cooling load exists, it's just that
the chillers aren't coming on to meet the load.
Terry Mapes
Energy Analyst
<http://www.glumac.com/>
________________________________
150 California Street, 3rd Floor
San Francisco, CA 94111
T. 415.398.7667 F. 415.398.0596
Thinking. Inside the building.
www.glumac.com <http://www.glumac.com/>
<http://www.glumac.com/>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20081015/6bf97b20/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/gif
Size: 50453 bytes
Desc: image001.gif
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20081015/6bf97b20/attachment.gif>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/gif
Size: 1425 bytes
Desc: image002.gif
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20081015/6bf97b20/attachment-0001.gif>
More information about the Equest-users
mailing list