[Equest-users] (no subject)
Andrew T McMurray
amcmurray at pacollinspe.com
Tue Jul 6 11:17:06 PDT 2010
Hello Everyone,
I am trying to finalize a building model for a LEED submission but am having difficulty getting the BEPS report "percent of hours any system zone outside of throttling range" to match the SS-R reports "zone under heated" and "zone under cooled" hours. This was a complaint from the LEED reviewer.
The building has three systems and all spaces are conditioned. The BEPS report lists hours outside of throttling range at 2% (175hrs), but the SS-R report lists under heated and cooled hours of 280 (3.2%).
I consider myself fairly familiar with equest but am unable to get these two numbers to match. Has anyone run into this problem in the past or have any ideas of where I should be focusing my attention?
Many Thanks,
Andrew McMurray, EIT
P. A. Collins PE Consulting Engineers
15 West 26th Street, 5th Floor
New York, NY 10010
tel: 212.696.5294
fax: 212.696.5295
www.pacollinspe.com
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20100706/4acaae3b/attachment.htm>
More information about the Equest-users
mailing list