[Equest-users] Circulation Loop Overload
tim
tim.jgrier at fuse.net
Tue Jul 6 10:42:23 PDT 2010
Trying to model GSHP system and keep it simple using default 3x5 with 1 well
field and 300' deep x 6" diameter boreholes, but I keep getting errors:
Circulation Loop Overload
Loop 'GSHP Water Loop' is
running over capacity for 540 hours in heating
Also, one zone is "outside throttling range" @ 200 hours under heated. All
other zones are also underheated, but for less than the 150 error threshold.
Does eQuest factor auxiliary coils in automatically with the vertical well
system or is there a need to do this manually? How would I specify
auxiliary heat if it is needed? Or can I oversize the geothermal system to
make this work?
Also would accept nearly any other idea - thanks.
Tim
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20100706/39ceb016/attachment.htm>
More information about the Equest-users
mailing list