[Equest-users] Data Center modeling

Derek Huang Derek.Huang at atce.com
Fri Jul 9 16:09:30 PDT 2010


Hi all,

 

I'm working on a energy model for a data center in Seattle. The data
center is served by 10 packaged rooftop units. The adjacent Transformer
rooms, UPS room and RO room are conditioned by transfer air from the
data center. I actually divide the data center, the transformer room and
RO room into 10 average pieces so each roof packaged serves (4) areas
and these areas are not connected together. So in DD Wizard mode under
Zone Pattern (page 2 of 25), I outline (4) different spaces (not
connected together) as a group. The program then assigned one system for
each area even though I have assigned one system for each Zone Group in
page 14 of 25. How could that be ?

 

Thanks,

 

Derek Huang, LEED AP, CPD                                       

Mechanical Engineer

 

 

 

97 E. Brokaw Road, No 300

San Jose, CA 95112

Direct: 408 487-1305

Fax:      408 436-1511

www.atce.com <http://www.atce.com/> 

derek.huang at atce.com

 

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20100709/2e8123b3/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/jpeg
Size: 2266 bytes
Desc: image001.jpg
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20100709/2e8123b3/attachment.jpeg>


More information about the Equest-users mailing list