[Equest-users] Title 24 Compliance with GSHP system
Greg Collins
GCollins at glumac.com
Tue Jul 20 09:18:54 PDT 2010
All,
I'm doing a compliance run with my model, so equest is creating separate
"T24 Standard" and "T24 Proposed" models. The HVAC system I'm modeling
consists of WSHPs in each zone coupled to a ground loop. For some
reason, the T24 Proposed model adds in a cooling tower that isn't there
in my regular model. Has anybody run into a similar situation or have
any speculations?
Greg Collins
Design Engineer / Energy Analyst
Mechanical Department
LEED(r) Accredited Professional
<http://www.glumac.com/>
________________________________
18200 Von Karman Avenue, Suite 100
Irvine, CA 92612
T. 949.833.8190 F. 949.833.0252
Thinking. Inside the building.
www.glumac.com <http://www.glumac.com/>
<http://www.glumac.com/>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20100720/d19152e5/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/gif
Size: 6582 bytes
Desc: image001.gif
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20100720/d19152e5/attachment.gif>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/gif
Size: 1425 bytes
Desc: image002.gif
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20100720/d19152e5/attachment-0001.gif>
More information about the Equest-users
mailing list