[Equest-users] 4-Pipe Fan Coil vs. VAV

Edward Kucirek kucirekengineering at hotmail.com
Fri Feb 4 10:25:06 PST 2011


I am running a simulation to compare various systems. When I run the 
4-pipe fan coil and I look at SS-D I get a building load for heating and
 cooling with what it should be but when I use the same building and 
change the system to Standard VAV with HW and CW the building cooling 
load is 20% higher and the building heating load is 65% higher. Does 
anyone have any suggestions as why this would be happening?

Kevin Hupf, LEED AP 

Kucirek Engineering, Inc.
7587 Main St.
Omaha, NE 68127
Ph: (402)951-0022
Fax: (402)951-0023
kucirekengineering at hotmail.com
www.kucirekengineering.com


 		 	   		  
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20110204/37ad49f3/attachment.htm>


More information about the Equest-users mailing list