[Equest-users] 4-Pipe Fan Coil vs. VAV
John Aulbach
jra_sac at yahoo.com
Fri Feb 4 10:48:46 PST 2011
Edward:
Are you controlling the cooling coil so it is on WARMEST for COOL-CONTROL ?? You
need make sure the cooling coil doesn't stay at a constant temperature. Excess
reheating will kill you.
John R. Aulbach, PE, CEM
Senior Energy Engineer
________________________________
PartnerEnergy
1990 E. Grand Avenue, El Segundo, CA 90245
W: 888-826-1216, X254| D: 310-765-7295 | F: 310-817-2745
www.ptrenergy.com| jaulbach at ptrenergy.com
________________________________
From: Edward Kucirek <kucirekengineering at hotmail.com>
To: equest-users at lists.onebuilding.org
Sent: Fri, February 4, 2011 10:25:06 AM
Subject: [Equest-users] 4-Pipe Fan Coil vs. VAV
I am running a simulation to compare various systems. When I run the 4-pipe fan
coil and I look at SS-D I get a building load for heating and cooling with what
it should be but when I use the same building and change the system to Standard
VAV with HW and CW the building cooling load is 20% higher and the building
heating load is 65% higher. Does anyone have any suggestions as why this would
be happening?
Kevin Hupf, LEED AP
Kucirek Engineering, Inc.
7587 Main St.
Omaha, NE 68127
Ph: (402)951-0022
Fax: (402)951-0023
kucirekengineering at hotmail.com
www.kucirekengineering.com
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20110204/30c11754/attachment-0002.htm>