Dear Jenny,

Do you have an idea of what shall we put for the Proposed Case?

I have a regular VAV system serving multiple zones. I tried 2 simulations: 1 with the Cool Control being "Constant" and 1 with the Cool Control being "Warmest" (similar to the baseline). I got an improvement of 17.5% in the first case, and 20.2% in the second case. I thought this parameter was not that significant, but it turned out to be so!

Which option do you suggest to adopt for the Proposed Scenario?

Many thanks!
Omar
___________________________
Omar Katanani
Sustainable Design Engineer
Email: omar at ecoconsulting.net
 
EcoConsulting (Lebanon)
Nahas Building, 4th floor
4 St-Maron Street / Georges Haddad Avenue
Postal Code: 2028 5806 SAIFI
Beirut, Lebanon
Tel:          +961 (0) 1 971 266
Mobile:    +961 (0) 3 045 045
 
EcoConsulting (UK) Ltd
28 Marshalsea Road
London, SE1 1HF
Tel:  +44 (0) 207 939 0989
Fax:  +44 (0) 207 939 0981
Website: www.ecoconsulting.net
 

-----Original Message-----
From: equest-users-bounces at lists.onebuilding.org [mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of Jenny Zhang
Sent: 21 January 2011 04:35
To: 'Ömer Moltay'; equest-users at lists.onebuilding.org
Subject: Re: [Equest-users] G3.1.3.12 Supply Air Temperature Reset

Hi Omer,
you can find reset option in the airside system screen(COOLING).
my approach is to choose reset>warmest>airflow first.(For VAV system I think the airflow will reduce first to satisfy load then the supply air temperature could rise at the minimum air flow rate.) 
the dealt t for reset is according to ASHRAE 90.1.

Regards
Jenny Z



-----Original Message-----
From: equest-users-bounces at lists.onebuilding.org [mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of ?mer Moltay
Sent: 2011年1月20日 23:54
To: equest-users at lists.onebuilding.org
Subject: [Equest-users] G3.1.3.12 Supply Air Temperature Reset

Dear All,

In eQuest, how can the air temperature for cooling in a VAV system be 
reset as required by G3.1.3.12?

Thank you,

Omer Moltay, LEED AP
Mimta Ltd.


-----
Bu iletide virüs bulunmadı.
AVG tarafından kontrol edildi - www.avg.com
Sürüm: 10.0.1191 / Virüs Veritabanı: 1435/3391 - Sürüm Tarihi: 19.01.2011

_______________________________________________
Equest-users mailing list
http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org
To unsubscribe from this mailing list send  a blank message to EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG
____________________________________________________________
Electronic mail messages entering and leaving Arup  business
systems are scanned for acceptability of content and viruses
_______________________________________________
Equest-users mailing list
http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org
To unsubscribe from this mailing list send  a blank message to EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG


More information about the Equest-users mailing list