i have followed the 62-1999 rates for the baseline. as the epact
requirements state the 90.1-2004 app g method has been modified to meet
the requirements of epact. this is one the differences. it is my
understanding that where there is a difference between epact
requirements and 90.1-2004 modeling requirements the epact requirement
takes precedence.
On 10/22/12 10:35 AM, Steve Jacobs wrote:
> Hi everyone,
> I have a question about the ventilation requirements for 179d
> modeling. The NREL guidelines state to use 62-1999 for the baseline
> and the actual rates for the proposed building. I'm so use to modeling
> ventilating rates the same in both models I wanted to make sure I'm
> interpreting this correctly. I've been doing separate 62 calculations
> per ASHRAE 62-1999 for the baseline. This can make a significant
> difference in the OA rates between the baseline and proposed. The 1999
> rates are higher than the 2004/2007 rates for some building area
> types. Also, if the baseline model is a VAV system with a critical
> zone driving the OA rate, the difference can be even greater.
> How have you guys handled this situation?
> On a separate note, has anyone done epact for building on a central
> plant. Obviously it is not covered by the NREL guidelines, so it seems
> like it is on the engineer to come up with a reasonable interpretation.
> - Steve
>
>
> _______________________________________________
> Equest-users mailing list
> http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org
> To unsubscribe from this mailing list send a blank message to EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20121022/7df8a736/attachment-0002.htm>
More information about the Equest-users
mailing list