[Equest-users] Merging 3 zones for 1 constant volume AHU

Cliff Andrew Cliff.Andrew at hhangus.com
Thu Mar 14 07:03:00 PDT 2013


Thanks John,

Thank you for the response. This space is a lobby in a school facility with large windows stretching from the second floor to the ceiling of the third floor. The main occupied space is the second floor and the area on the third floor is mostly open to below, as it just has a staircase up to a walkway over the space. The AHU serving this space is one of 5 AHU's in the building. These spaces are only 3 of around 100 spaces, however they are among the largest spaces.

I would not be able to rebuild them as the rest of the building is complete and has many other spaces. I guess I am looking for the best way to model what should have been one large multi story space(the spaces don't line up perfectly so I can't just extend the walls) with one constant volume system.

I could place a constant volume system with the control zone on the main floor, however due to the windows I am afraid I might run into problems? Is there a way to connect the spaces by say removing the floor or something, allowing the air, heat, etc to flow freely between the two?

Thank you,

Cliff Andrew, B.Sc.(Eng.), EIT


From: John Aulbach [mailto:jra_sac at yahoo.com]
Sent: March-14-13 12:59 AM
To: Cliff Andrew; equest-users at lists.onebuilding.org<mailto:equest-users at lists.onebuilding.org>
Subject: Re: [Equest-users] Merging 3 zones for 1 constant volume AHU

Hi Cliff:

If you have zones on separate floors, you do not have one zone.This somehow sounds like a residence, where a single thermostat is basically controlling one zone, with the others just going along for the ride.

Are there other HVAC systems/zones involved, or are these three the only spaces in the 2nd and 3rd floorof the building? If so, rebuild your 2nd and 3rd floors into one large zone, ignoring the floor between floors 2 and 3.

John Aulbach

From: Cliff Andrew <Cliff.Andrew at hhangus.com<mailto:Cliff.Andrew at hhangus.com>>
To: "equest-users at lists.onebuilding.org<mailto:equest-users at lists.onebuilding.org>" <equest-users at lists.onebuilding.org<mailto:equest-users at lists.onebuilding.org>>
Sent: Wednesday, March 13, 2013 4:49 PM
Subject: [Equest-users] Merging 3 zones for 1 constant volume AHU

Hi,

I have made the mistake of setting up 3 different zones for what should be a single zone with a constant volume AHU system. Currently 2 of the three zones are on the 3rd Floor, and the other zone is on the Second Floor. I was wondering if there is a way I can join these three zones, or if there is an alternative way to model this system?

Best Regards,

Cliff Andrew, B.Sc.(Eng.), EIT


_______________________________________________
Equest-users mailing list
http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org
To unsubscribe from this mailing list send  a blank message to EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG<mailto:EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20130314/e5208df2/attachment-0002.htm>