[Equest-users] Fwd: eQuest Enduse results table
Byron Burns
B.Burns at ha-inc.com
Fri Apr 4 04:34:49 PDT 2014
Hello Nathan and Y,
I normally just create an electric sub meter and assign it to the main electric meter. This will allow me to see the end-use energy broke out separately on the PS-F report. You can assign a specific meter to a HVAC zone end-use energy as well if you need to isolate the elevator room separately. I am not familiar with the NYSERDA requirements but this works for LEED.
[cid:image009.jpg at 01CF4FD8.5B87F240]
[cid:image010.jpg at 01CF4FD8.5B87F240]
[cid:image011.jpg at 01CF4FD8.5B87F240]
[cid:image013.jpg at 01CF4FD8.5B87F240]
[cid:image014.jpg at 01CF4FD8.5B87F240]
Byron D. Burns, EIT, BEMP
Energy Analyst/ Modeler
H&A Architects & Engineers | www.ha-inc.com<http://www.ha-inc.com>
d: (804) 420-1622 p: (804) 285-4171 f: (804) 217-8520
From: equest-users-bounces at lists.onebuilding.org [mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of Nathan Miller
Sent: Thursday, April 03, 2014 6:31 PM
To: yashika gulati; equest-users at lists.onebuilding.org
Subject: Re: [Equest-users] Fwd: eQuest Enduse results table
You could pick an end use category that is currently unused, such as refrigeration or task lights, and assign the elevator loads to that end use. In detailed edit you can also create sub-meters to the main electrical meters to separate out the load, but that is more work.
Nathan Miller - PE, LEED(r)AP BD+C, CEM
Mechanical Engineer/Senior Energy Analyst
RUSHING | D 206-788-4577 | O 206-285-7100
www.rushingco.com<http://www.rushingco.com/>
From: equest-users-bounces at lists.onebuilding.org<mailto:equest-users-bounces at lists.onebuilding.org> [mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of yashika gulati
Sent: Thursday, April 03, 2014 2:13 PM
To: equest-users at lists.onebuilding.org<mailto:equest-users at lists.onebuilding.org>
Subject: [Equest-users] Fwd: eQuest Enduse results table
Hi
I am working upon one multi-family high rise building in Brooklyn. For that, I need to install elevators as per NYSERDA guidelines in eQuest model. I know I can give schedules in equipment loads separately for elevators but how can I get separate results for that in end use result table. Is there any way if I can customise result table (please find attached image) to see the separate row for elevators?
Thanks
Y
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20140404/cafe4726/attachment-0002.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image009.jpg
Type: image/jpeg
Size: 4334 bytes
Desc: image009.jpg
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20140404/cafe4726/attachment-0010.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image010.jpg
Type: image/jpeg
Size: 19235 bytes
Desc: image010.jpg
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20140404/cafe4726/attachment-0011.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image011.jpg
Type: image/jpeg
Size: 17593 bytes
Desc: image011.jpg
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20140404/cafe4726/attachment-0012.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image013.jpg
Type: image/jpeg
Size: 26896 bytes
Desc: image013.jpg
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20140404/cafe4726/attachment-0013.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image014.jpg
Type: image/jpeg
Size: 61609 bytes
Desc: image014.jpg
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20140404/cafe4726/attachment-0014.jpg>
More information about the Equest-users
mailing list