[Equest-users] Central Plant Energy Metering
John Aulbach
jra_sac at yahoo.com
Thu Apr 24 11:09:02 PDT 2014
try 8 central plants.
john r aulbach, pe
----------
Sent from AT&T's Wireless network using Yahoo! Mail
------Original Message------
From: yashika gulati <yashika.gulati111 at gmail.com>
To: <equest-users at lists.onebuilding.org>
Date: Thursday, April 24, 2014 2:00:05 PM GMT-0400
Subject: [Equest-users] Central Plant Energy Metering
Hi great minds
I have a central plant system with chillers and boilers in my eQuest model.
There are eight VAV systems. I want to separate the energy end uses used by
these different VAV systems. I created separate electric and fuel meters
for each VAV system and assigned in the HVAC tab and ran the simulation. I
was hoping to see energy use breakdown for central plant equipments in the
breakdown. Except central plant energy use (cooling, heating, pumps and
Heat rejection) everything else was reported as I wanted. Is there any way
I can see a report with central plant energy use broken down at the air
side system?
Thanks in advance!
*Yashika Gulati,* LEED-AP BD+C
Associate, the green architecture
www.thegreenarchitecture.org
Design Analyst, Sustainability & Energy Group
energyHUB
_______________________________________________
Equest-users mailing list
http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org
To unsubscribe from this mailing list send a blank message to EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG
More information about the Equest-users
mailing list