Hi Chris,

Yes, the approach you state (in quotes below) is correct.

"where a floor is modeled with two or more separate shells, combine the
equest created systems into one system for that floor"

For example, if you have to model a multi-story building which has two
wings, with two multi-story shells (one for each wing), there should still
only be one system per floor. If you are using wizard to generate the
systems and it creates two or more systems for a floor, you can re-assign
the thermal zones to be on a single system and delete the other systems.

Regards,
John

*John Kopf, BEng, MASc, EIT, LEED AP BD+C*

Sustainability Analyst
Stantec
200 - 325 25th Street SE Calgary AB T2A 7H8
Phone: (403) 716-8006
Fax: (403) 716-8049
John.Kopf at stantec.com



[image: Stantec] <http://www.stantec.com/>



*Celebrating 60 years of community, creativity, and client relationships.*



The content of this email is the confidential property of Stantec and
should not be copied, modified, retransmitted, or used for any purpose
except with Stantec's written authorization. If you are not the intended
recipient, please delete all copies and notify us immediately.



ü Please consider the environment before printing this email.

On Mon, Nov 17, 2014 at 7:55 AM, Jones, Christopher <cjones at halsall.com>
wrote:

> Appendix G3.1.1 states that for systems 5, 6, 7, and 8, each floor shall
> be modeled with a separate HVAC system.  When performing the Compliance
> Analysis eQuest creates a Baseline separate system for each shell even
> though a floor may be modeled with 2 or more shells.  My question is should
> the Baseline systems be revised so that each floor has only one system - in
> other words, where a floor is modeled with two or more separate shells,
> combine the equest created systems into one system for that floor?
>
>
>
> Christopher Jones, P.Eng.
> Halsall Associates
> Tel: 416.644.4226 . Toll Free: 1.888.425.7255 x 527 .  www.halsall.com
> Vancouver . Calgary . Sudbury  . Burlington . Toronto . Ottawa
> Best Workplaces in Canada, Seven Consecutive Years: 2007 - 2013
> ___________________________
> A Parsons Brinckerhoff Company
>
>
> ______________________________________________________________________
> NOTICE: This communication and any attachments ("this message") may
> contain confidential information for the sole use of the intended
> recipient(s). Any unauthorized use, disclosure, viewing, copying,
> alteration, dissemination or distribution of, or reliance on this message
> is strictly prohibited. If you have received this message in error, or you
> are not an authorized recipient, please notify the sender immediately by
> replying to this message, delete this message and all copies from your
> e-mail system and destroy any printed copies.
> _______________________________________________
> Equest-users mailing list
> http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org
> To unsubscribe from this mailing list send  a blank message to
> EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20141117/e96c56b5/attachment.htm>


More information about the Equest-users mailing list