[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[EnergyPlus_Support] Simulation Parameters, Loads-HVAC time steps



How do Load and System modules handle time step settings?

This scheme is discussed in detail in the provided EnergyPlus Engineering Manual (Intgrated Solution Manager and following sections) and the papers that are referenced there.  The entire Predictor-Corrector is based on this zone-system connection and needs pages to describe its connection.  In a nutshell, the system tries to simulate lock step with the heat balance time step.  When temperature instabilities are determined, the HVAC systems reduce their simulation Time steps to something shorter than the heat balance time step, currently with a one minute minimum.  The systems stimulate at this shorter time step until the end of the heat balance time step, then they update and the entire simulation moves forward in time.

To unsubscribe from this group, send an email to:
EnergyPlus_Support-unsubscribe@xxxxxxxxxxxxxxx

The primary EnergyPlus web site is found at:
http://www.eren.doe.gov/buildings/energy_tools/energyplus/





Your use of Yahoo! Groups is subject to the Yahoo! Terms of Service.