[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[EnergyPlus_Support] Hybrid boiler system system



Dear E+ Forum,

I am modeling a "hybrid" boiler system, which uses a small high
efficiency condensing boiler as the first stage of heating, and a
larger, less efficient boiler as the second stage.

I've manually sized the boiler capacities and boiler water flows.  I
have also set the HEATING LOAD RANGE BASED OPERATION to define the
upper limit of the first stage as equal to the first boiler's capacity.

However, the first boiler never reaches full capacity before the
second boiler starts operating.

Have any of you modeled this system? Can you offer suggestions why the
first boiler is not loading fully?

Thanks!


------------------------------------

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are not allowed -- please post any files to the appropriate folder in the Files area of the Support Web Site.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/EnergyPlus_Support/

<*> Your email settings:
    Individual Email | Traditional

<*> To change settings online go to:
    http://groups.yahoo.com/group/EnergyPlus_Support/join
    (Yahoo! ID required)

<*> To change settings via email:
    mailto:EnergyPlus_Support-digest@xxxxxxxxxxxxxxx 
    mailto:EnergyPlus_Support-fullfeatured@xxxxxxxxxxxxxxx

<*> To unsubscribe from this group, send an email to:
    EnergyPlus_Support-unsubscribe@xxxxxxxxxxxxxxx

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/