I am having some problems running my model during all year: it is a__._,_.___
tower surrounded by other buildings located in Manila (Filippines) and
I am analysing indoor conditions.
If I run the file all year long in a single run period it seems to work
but at the end of tje simulation it crashes without showing me any
error message. Nevertheless, if I split the run period into two
(January-June and then July-Dec) it runs.
Do you think this might affect my simulation results in any way?
I updated the file, it is called "Manila Tower".
thanks a lot!
Marzia