[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[EnergyPlus_Support] 2.5 year run





I would like to run a model with 2.5 years of actual weather data in one pass (stopping to warm up again is not a good option).  It appears from what I’ve read that I can run 3 years (integer value for number of times run period repeated).  I did not find an EMS component that could stop the run without crashing it, which I assume means no data processing.  Running 3 years takes between 5 and 7 hours depending on the machine I use so there is some time savings if I can clip 0.5 year off the calculation.  Anyone have a suggestion?

 

Ned Lyon, P.E. (MA)
Staff Consultant

SIMPSON GUMPERTZ & HEGER 
     | Engineering of Structures and Building Enclosures

41 Seyon Street, Bldg. 1, Suite 500
Waltham, MA 02453

781.907.9000 main
781.907.9350 direct 
781.907.9009 fax
www.sgh.com



__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___