I would like to run a model with 2.5 years of actual weather
data in one pass (stopping to warm up again is not a good option). It
appears from what I’ve read that I can run 3 years (integer value for number
of times run period repeated). I did not find an EMS component that could
stop the run without crashing it, which I assume means no data
processing. Running 3 years takes between 5 and 7 hours depending on the
machine I use so there is some time savings if I can clip 0.5 year off the
calculation. Anyone have a suggestion? Ned
Lyon, P.E. (MA) 781.907.9000 main __._,_.___ Primary EnergyPlus support is found at: http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx The primary EnergyPlus web site is found at: http://www.energyplus.gov The group web site is: http://groups.yahoo.com/group/EnergyPlus_Support/ Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files. EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.